Loading
Project Details

Supply and Erection of suspended ceiling with “Track deck Hi rib” or equivalent roofing sheets in transformer hall of URI II Power Station J&K

Overview

Uri-II power station is run-of-the-river scheme with an installed capacity of 240 MW (4 X 60 MW) to harnesses the Hydropower potential of river Jhelum (a tributary of Indus river). It is located in Uri tehsil of Baramulla district of Jammu & Kashmir. The project comprises of a 52 m high concrete gravity dam with 4 penstock each of 34.50 m length (MIV to PH) and 3.5 m diameter each

Client

NHPC Limited