45, Megawatts Nimmo Bazgo Hydroelectric Project is located 70 kms from Leh and Situated around 11,000 feet above sea level.

Inspite of freezing climate conditions, for the first time in India concreting was done at -380 C temperature to ensure the reliable Power Supply to the Electricity deficiency Ladakh region.

The project involved the construction of a concrete gravity dam, diversion channel, surface power house of 45 MW, a short tail, race channel, transformer yard and switch yard.