Loading
Project Details

Yearly Major overhauling of generating units and its accessories at Teesta V, Sikkim.

Overview

Teesta-V Power Station (3x170 MW) is a run of the river scheme with diurnal storage to harness the hydro power potential of river Teesta for peaking during the lean season and is located in the state of Sikkim. The project comprises of 88.6 m high Concrete Gravity Dam (located 2 Kms downstream of its confluence with Dikchunala) with three Penstock of length 321 m and 17.2 Km long Head Race Tunnel housed on left bank

Client

NHPC Limited